azimuth:setting_up_azimuth
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
azimuth:setting_up_azimuth [2018/05/09 14:30] – su | azimuth:setting_up_azimuth [2018/05/11 07:43] (current) – su | ||
---|---|---|---|
Line 4: | Line 4: | ||
- | === Ensure efficient maintenance scheduling on major pieces of rotating equipment. | + | === Ensure: === |
+ | *efficient maintenance scheduling on major pieces of rotating equipment. | ||
+ | *reliability | ||
+ | *downtime tracking (planned/ | ||
+ | |||
+ | ---- | ||
==== Prerequisites ==== | ==== Prerequisites ==== | ||
* **Alarm Analysis** (//type//) data source. Source data source, will be used to define equipment events. Azimuth will use these event definitions to monitor equipment. | * **Alarm Analysis** (//type//) data source. Source data source, will be used to define equipment events. Azimuth will use these event definitions to monitor equipment. | ||
- | * **Alarm Analysis** (// | + | * **Edge Historian** data source. |
+ | |||
+ | ---- | ||
azimuth/setting_up_azimuth.1525876205.txt.gz · Last modified: 2018/05/09 14:30 by su